Illinois TollwayILLINOIS TOLLWAY PRESS RELEASES

For construction information please contact Jan Kemp.
For all other Tollway media inquiries contact Joelle McGinnis.
( Back | Home | News Room )
11/02/2009 Illinois Tollway Construction Alerts
Tri-State Tollway (I-294/I-94/I-80)
Overnight and off-peak closures are scheduled for pavement striping and bridge work.

November 2 – Overnight Lane Closures
  • One southbound lane from 87th Street to Roberts Road will close at 8 p.m. tonight, November 2, for bridge work. Two additional lanes will close at 10 p.m. All lanes will reopen at 5 a.m. on Tuesday, November 3. The same closures are planned northbound on Tuesday, November 3.
  • One southbound lane between Electric Avenue and Butterfield Road will close at 8 p.m. tonight, November 2, for bridge work. Two additional lanes will close at 10 p.m. All lanes will reopen at 5 a.m. on Tuesday, November 3. The same closures are planned on Tuesday, November 3.
  • One northbound lane between Bradley Road and Buckley Road will close at 9 p.m. tonight, November 2, for overhead sign work. Several full, 15-minute closures of the southbound lanes are scheduled after midnight. All lanes will reopen at 8 a.m. on Tuesday, November 3. The same closures are planned on Tuesday, November 3.
November 3 – 6 – Off-Peak Lane Closures
  • Traffic on Central Road under I-294 will be reduced to one lane from 7 a.m. to 3 p.m. on Tuesday, November 3, for sewer work. Two-way traffic will be controlled by flaggers. The same closure is planned on Wednesday, November 4.
  • One westbound lane on the Edens Spur between the plaza and I-294 will close from 9 a.m. to 2 p.m. on Tuesday, November 3, for bridge work. The same closure is planned daily through Friday, November 6.
  • One southbound lane between Willow Road and Rand Road will close from 9 a.m. to 3 p.m. on Tuesday, November 3, for signage installation work.
  • One lane in each direction between Willow Road and Lake Cook Road will close from 7 a.m. to 3 p.m. on Tuesday, November 3, for signage installation.
  • One lane in each direction between Dempster Street and Willow Road will close from 7 a.m. to 5 p.m. on Tuesday, November 3, for signage installation work.
Reagan Memorial Tollway (I-88)
Lane closures are scheduled for pavement striping and overhead sign work.

November 2 – Overnight Lane Closures
  • One westbound lane between the Fox River Bridge and IL Route 31 will close at 8 p.m. tonight, November 2, for pavement striping work. The lane will reopen by 5 a.m. Tuesday, November 3.
November 3 – Off-Peak Lane Closures
  • One lane in each direction on Eola Road between I-88 and IL Prairie Path Bridge from 7 a.m. to 4 p.m. on Tuesday, November 3. The same closure is planned daily through Friday, November 6.
  • One lane in each direction on Bilter Road between I-88 ramps and Eola Road from 7 a.m. to 4 p.m. on Tuesday, November 3. The same closure is planned daily through Friday, November 6.
Jane Addams Memorial Tollway (I-90)
Off-peak lane closures are scheduled for paving work.

November 3 – Off-Peak Lane Closures
  • One eastbound lane between I-39 and the Kishwaukee River will close from 6 a.m. to 5 p.m. on Tuesday, November 3, for paving work. The same closure is planned Wednesday, November 4.
Veterans Memorial Tollway (I-355)
Off-peak lane closures are scheduled for erosion control work.

November 2 – Overnight Lane Closures
  • Two northbound lanes between 75th Street and 71st Street will close at 8 p.m. tonight, November 2, for electrical work. The lanes will reopen at 5 a.m. on Tuesday, November 3.
Work Zone Safety

A 45 m.p.h. speed limit is in effect 24/7 in all construction zones, whether or not workers are present. Drivers should continue to watch for changing traffic patterns and use caution, especially when workers are present. Illinois State Police have zero tolerance for drivers speeding in work zones. The minimum penalty for speeding in a work zone is $375. Posted signs advise motorists of a $10,000 fine and 14-year jail sentence for hitting a roadway worker. Keep Workers Alive – Drive 45.

Know Before You Go

The Tollway offers a variety of ways for drivers to get the latest information on construction and traffic on our roads.

  • www.illinoistollway.com – Construction Section – for details by road
  • 1-800-TOLL-FYI – daily lane closure info
  • Roadway and electronic signs
  • www.gcmtravel.comtravel times
  • Sign up for E-mail updates
    • Up-to-the-minute traffic by road – www.nbc5.com
    • Construction eNewsletter – www.illinoistollway.com

All Work is Weather Dependent


Please visit the News Room for more Press Releases.